The validification for mold qualification
and manufacturing process are equally
important for user. Intertech can do both of them good and quick,
contact us now !
How to streamline plastic injection mold
qualification and process validation
A moldmaker said recently that it sometimes
takes him up to eight months to validate a large,
high-cavity medical mold. Maybe this
surprises you, but it doesn’t surprise many OEMs in the
medical and automotive industries that have
extensive mold qualification and process validation
requirements.
Qualifying a mold and validating the
molding process in the medical device (FDA requirements) and
automotive (Pre-Production Approval Process
or PPAP) industries typically requires that the validation
process be performed in a specific molding
machine that will also be used in production.
Usually that means that the moldmaker first
qualifies the mold either in-house (if the moldmaker has
that capability) or uses an outside molder.
After the mold is shipped to the OEM or
molder that will run production, mold qualification and
process validation must be repeated in the
press that will be used after the mold is installed in the
production molding facility. Because proper
validation that conforms to FDA or PPAP standards
requires that the mold be validated in the
press in which it will run, some OEMs have a protocol that
calls for shipping the molding press to the
moldmaker (if he or she is capable of performing mold
qualification and process validation) or to
the molder where the mold will run in production.
That ensures that mold qualification and
process validation will be done in the same machine
that runs production.
However, medical part validation protocols
in many cases require re-validation of the molding process
and re-qualification of the mold even if
the press is moved slightly from its original placement on the
production floor. That means the entire
qualification and validation process needs to be repeated,
a time-consuming and costly event.
sourced from :
https://www.plasticstoday.com/injection-molding/how-streamline-plastic-injection-mold-
qualification-and-process-validation/21779763857805
沒有留言:
張貼留言